CASE STUDY

Steel Warehouse

Location

Calvert, AL

SERVICES

Survey, Structural, Electrical, Fire Protection, Life Safety, Mechanical

INDUSTRY

Metals, Manufacturing

Steel Warehouse Alabama features a state-of-the-art push-pull pickler capable of pickling hot-rolled coils up to one inch thick and up to 72” in width. The new facility has rail and truck access and barge access nearby. The line can produce pickled dry, pickled and oiled, Mil-Bond and dry lubed strip. GSE provided complete engineering services for Steel Warehouse’s heavy gage Push/Pull Pickle Line, which was constructed at the Calvert Industrial Park. The scope of this work included engineering for all buildings and equipment support for the approximately 106,000-square-foot facility.