GSE provided complete engineering services for Bilstein’s first mill constructed outside of Germany. Built on a 61-acre Greenfield site, the facility is strategically located to serve the region’s growing automotive industry. GSE provided site layout, paving and grading design, stormwater modeling, water and sanitary sewer service design, coordination of utilities, rail spur design and handled permitting with local and state agencies for this project. The scope of work for Phase I included creating the main steel processing facility with adjacent driveways and access, separate access points for truck/employee/visitor traffic, stormwater collection and detention facilities, and planning for a future rail spur.